QUALITY ASSURANCE PLAN

Lined Valve Standard

Quality Assurance Plan for Lined Ball, Plug & Butterfly Valves — covering raw material, in-process, finished product, and final inspection stages.

About This QAP

Our complete Quality Assurance & Control procedure for Lined Ball, Plug, and Butterfly Valves — from raw material verification through hydrostatic and spark testing, dimension control, and final painting inspection. All UNP valves are 100% tested before dispatch with full traceability via Final Inspection Reports and Material Test Certificates.

Quality Assurance Plan — Lined Ball, Plug & Butterfly Valve

SR.NO ITEMS PARAMETER TYPE OF CHECK QUANTUM REFERENCE DOC. & ACCEPTANCE NORMS DOCUMENT RECORD UNP SCOPE TPIA / CUSTOMER
PWRWR
1. Raw Material — (A) Non-Metallic Parts, (B) Metallic Parts
ALining MaterialIntactnessVisual100%P.O. Specification & Product Data SheetsSupplier MTC / COC
Grade ConfirmationVisual100%Product Data SheetsSupplier MTC / COC
Physical VerificationVisual100%Product Data SheetsSupplier MTC / COC
BValve Body, Side-Piece, Ball (Insert), Plug (Insert) & Disc (Insert)Chemical & Mechanical Properties per approved GAD / QAP / PO SpecificationChemical & Mechanical Property1 Sample / Size / Heat or per POManufacturer / Supplier TC or NABL Lab TCEN-10204 Type 3.1 TC
2. In-Process Inspection
AValve Body, Side-Piece, Plug, Ball (Insert)Porosity CheckSpark Test (NA for Antistatic)100%UNP Spark Test ProcedureFinal Insp. Report
Physical VerificationVisual100%UNP Mfg. DrawingsFinal Insp. Report
DimensionsMeasurement100%UNP Mfg. DrawingsUNP Inward IR
3. Finished Products — CS + PFA Lined Ball / Plug / Butterfly Valves
3.1Lined Ball / Plug / Butterfly ValvesLeakage Test (Shell / Body)Hydrostatic Test100%UNP Hydro Test Procedure or Approved GADFinal Insp. Report✓ (10%)
Leakage Test (Seat) — HydrostaticHydrostatic Test100%UNP Hydro Test Procedure or Approved GADFinal Insp. Report✓ (10%)
Leakage Test (Seat) — PneumaticPneumatic Test Pressure100%UNP Pneumatic Test ProcedureFinal Insp. Report✓ (10%)
Lining IntactnessSpark Test (NA for Antistatic) @20 KVDC100%UNP Spark Test Procedure or Approved GADFinal Insp. Report✓ (10%)
Lining ThicknessThickness Check100%3.2 mm MinimumFinal Insp. Report✓ (10%)
Dimension MeasurementDimension Inspection100%Approved GAD / UNP As-Built DrawingFinal Insp. Report✓ (10%)
WorkmanshipVisual100%UNP StandardFinal Insp. Report✓ (10%)
4. Final Inspection — Painting
4.1Lined ValveDFT, Final Shade, VisualDFT & Visual Inspection100%UNP Painting Procedure / Customer PO Spec / Approved Drawing / Data SheetIR

Legend

P
PerformUNP Action
W
WitnessObserve Test
R
ReviewDocument Check

Notes

Customer & Inspection Notes

  • The above QAP is our internal procedure of Quality Assurance & Control.
  • We provide our Final Inspection Report & MTC or COC to Customers.
  • Based on Inspection Report we allow our customer to check the following:
  1. Physical Verification of Valves & Quantity Check
  2. Witnessing a leakage Test (Hydro Test) as per our Standard Test Procedure & pressure rating confirmed per QAP Scope
  3. Dimension Check of final assembly of Valve as per our standard or as-built drawings
QUALITY ASSURED