QUALITY ASSURANCE PLAN

Pipe Fitting Standard

Quality Assurance Plan for Lined Pipe Spools & Fittings — covering raw material, semi-finished and finished product inspection, painting, marking, and IRN clearance.

About This QAP

Our complete Quality Assurance & Control procedure for Lined Pipe Spools and Fittings — from raw material certification through welding quality inspection, spark testing at 15 KVDC, hydrostatic leak testing per ASTM F 1545, dimensional measurement, painting DFT verification, and final IRN clearance for shipment.

Quality Assurance Plan — Lined Pipe & Fitting

SR.NO ITEMS PARAMETER TYPE OF CHECK QUANTUM REFERENCE DOC. & ACCEPTANCE NORMS DOCUMENT RECORD UNP SCOPE TPIA / CUSTOMER
PWRWR
1. Raw Material
ALining MaterialIntactnessVisual100%P.O. Specification & Product Data SheetsSupplier MTC / COC
Grade ConfirmationVisual100%Product Data SheetsSupplier MTC / COC
Physical VerificationVisual100%Product Data SheetsSupplier MTC / COC
BMetallic Parts — Pipe Spool & FlangeChemical & Mechanical Properties per approved GAD / QAP / PO SpecChemical & Mechanical Property1 Sample / Size / Heat or per POManufacturer / Supplier TC or NABL Lab TCEN-10204 Type 3.1 TC
2. Semi-Finished Products
2.1Visual Inspection of Completed Pipe & FittingWelding Check / Welding QualityVisual100%Manufacturing DrawingUNP Inward IR
Physical VerificationVisual100%Manufacturing DrawingUNP Inward IR
2.2Antistatic PTFE / PTFE / PFA LiningPorosity CheckSpark Test (NA for Antistatic)100%UNP Spark Test ProcedureFinal Insp. Report
Physical VerificationVisual100%UNP Mfg. DrawingsFinal Insp. Report
DimensionsMeasurement100%UNP Mfg. DrawingsUNP Inward IR
3. Finished Products — Lined Pipe Spools & Fittings
3.1Lined Pipe Spools & FittingsLeakage Test (Shell / Body)Hydrostatic Test100%UNP Hydro Test Procedure / Approved GAD / ASTM F 1545Final Insp. Report✓ (10%)
Lining Intactness (NA for Antistatic)Spark Test @15 KVDC100%UNP Spark Test Procedure / Approved GAD / ASTM F 1545Final Insp. Report✓ (10%)
Lining ThicknessThickness Check100%3.2 mm Minimum or Approved GADFinal Insp. Report✓ (10%)
Dimension MeasurementDimension Inspection100%Approved GAD / UNP As-Built DrawingFinal Insp. Report✓ (10%)
WorkmanshipVisual100%UNP StandardFinal Insp. Report✓ (10%)
4. Final Inspection — Painting & Marking
4.1Lined Pipe Spools & FittingsDFT, Final Shade, VisualDFT & Visual Inspection100%UNP Painting Procedure / Customer PO Spec / Approved DrawingIR
4.2Lined Pipe Spools & FittingsHeat No., Size, Serial No.Visual (Marking & Identification)100%Customer PO Specification / Approved Drawing
5. IRN (Inspection Release Note)
5.1Lined Pipe Spools & FittingsClearance for Shipment100%IVR & IRNIVR / IRN or Customer MailHH

Legend

P
PerformUNP Action
W
WitnessObserve Test
R
ReviewDocument Check
H
HoldStop & Inspect

Notes

Customer & Inspection Notes

  • The above QAP is our internal procedure of Quality Assurance & Control.
  • We provide our Final Inspection Report & MTC or COC to Customers.
  • Based on Inspection Report we allow our customer to check the following:
  1. Physical Verification of Pipes & Fittings
  2. Witnessing a leakage Test (Hydro Test) as per our Standard Test Procedure & pressure rating confirmed per QAP Scope
  3. Dimension Check of final assembly of Pipe Fittings as per our standard or as-built drawings
QUALITY ASSURED